  1. 01

    Maintenance work order

    A structured instruction for planning, executing, and documenting a specific maintenance task.

  2. 02

    Alarm code

    A short identifier a machine displays for a condition that needs attention, which may or may not indicate a functional failure.

  3. 03

    As-built documentation

    Documentation recording how an asset was actually installed and configured on site, which can differ from the original design.

  4. 04

    Asset hierarchy

    The structured, parent-child arrangement of assets and sub-assemblies used to organize maintenance data at the right level.

  5. 05

    Asset register

    The complete list of assets an organization maintains, each with its identifying and descriptive data.

  6. 06

    Bill of Materials

    A structured list identifying every part and quantity that makes up a specific asset or assembly.

  7. 07

    Critical spare

    A spare part whose unavailability would cause severe downtime, safety, or cost consequences, warranting dedicated stock despite low usage.

  8. 08

    Defect list

    A record of specific items found not to meet the required standard during an inspection, still awaiting correction.

  9. 09

    Diagnostic code

    The broad category of technical identifiers a system produces to describe status, events, warnings, or faults for troubleshooting.

  10. 10

    Equipment tag

    A unique identifier code assigned to a specific piece of equipment, used to reference it consistently across all records.

  11. 11

    Fault code

    A machine- or controller-generated identifier for a specific detected malfunction that has already affected a function.

  12. 12

    Job plan

    A reusable, predefined preparation template for a recurring maintenance job (scope, resources, and steps) created before any specific execution date.

  13. 13

    Kitting

    Assembling all parts and materials a specific job needs into one prepared set before the technician starts work.

  14. 14

    Knowledge transfer

    The deliberate process of passing maintenance expertise from one person to another, particularly experienced to less experienced staff.

  15. 15

    Lockout/Tagout

    A safety procedure that physically locks and tags energy-isolation points so a machine cannot be energized while someone works on it.

  16. 16

    Maintenance checklist

    A structured list of specific points to check off systematically during an inspection or task, verifying compliance with a defined standard.

  17. 17

    Maintenance history

    The accumulated record of past maintenance actions and findings on an asset, used to inform future decisions.

  18. 18

    Maintenance knowledge base

    An organized, reusable repository of maintenance know-how and solutions, structured for lookup rather than chronological review.

  19. 19

    Maintenance notification

    A flagged observation of a possible maintenance need, raised for evaluation before any work is approved or scheduled.

  20. 20

    Maintenance report

    An internal record documenting what maintenance work was performed on an asset, by whom, and with what finding.

  21. 21

    Maintenance standard

    A documented, binding requirement or acceptance criterion that maintenance work or asset condition must meet.

  22. 22

    Maintenance storeroom

    The physical facility where spare parts and materials are stored, issued, and tracked for maintenance work.

  23. 23

    Maintenance, Repair and Operations

    The category of goods and services procured to keep operations running (spare parts, tools, and supplies) distinct from raw production materials.

  24. 24

    OEM manual

    The manufacturer's official documentation for a specific product, covering operation, maintenance, and specifications for that exact model.

  25. 25

    Permit to Work

    A formal authorization process that reviews, approves, and coordinates a specific work activity before it begins, particularly for higher-risk tasks.

  26. 26

    Revision control

    The managed process of tracking and approving changes to technical documents, ensuring only the current, correct version is in use.

  27. 27

    Service report

    A record documenting a specific service visit or engagement (its scope, findings, and recommendations) often involving an external provider.

  28. 28

    Shift handover

    The structured transfer of open tasks, findings, and asset status from one shift's team to the next.

  29. 29

    Spare part

    A physical component kept in stock and installed to restore an asset to function after a failure or during planned maintenance.

  30. 30

    Spare parts catalog

    A reference organizing available spare parts for identification and selection, across the inventory rather than tied to one asset's structure.

  31. 31

    Standard Operating Procedure

    A formally standardized procedure that governs how a specific process should be performed consistently, across situations or personnel.

  32. 32

    Tacit knowledge

    Experience-based understanding a person has but has not written down: the specific kind of knowledge that knowledge transfer aims to capture.

  33. 33

    Technical documentation

    The full set of technical documents describing an asset's design, operation, and maintenance requirements.

  34. 34

    Troubleshooting

    The end-to-end, hands-on process of investigating a specific problem, narrowing it to a cause, and resolving it.

  35. 35

    Work instruction

    Detailed, step-by-step guidance for performing a specific task correctly and safely, followed during execution.

  36. 36

    Work request

    A formal ask for maintenance work with a defined need and scope, submitted for planning and scheduling approval.